Soundside Drive Septic to Sewer Project (Restore)
Last updated on January 31st, 2023 at 04:16 pm
The project includes the installation of a low-pressure sewer force main and lot stub-outs along Soundside Drive between East Shore Boulevard and Oak Drive, including Spruce Street. Additional work includes the proper abandonment of existing septic tanks and the installation of grinder pump stations including, but not limited to, wet wells, pumps, electrical hookups, piping connection to roadway stub outs, property restoration, and all appurtenances necessary for a complete and operational system.
Project Milestones:
Milestone
Date
Notes
Council Approval to Advertise
01/17/2023
Bid Awarded by Council
03/20/2023
Pre-Construction Meeting
04/13/2023
Construction Commence
04/19/2023