The Project Area is in Tiger Point. The work includes the construction of infrastructure …
1.5 MGD Expansion for Tiger Point Waste Water Treatment FacilityRead More
The Project Area is in Tiger Point. The work includes the construction of infrastructure …
1.5 MGD Expansion for Tiger Point Waste Water Treatment FacilityRead More
This project is currently in the DESIGN phase and has not been advertised. STATUS …
Extension of Multi-Use Pathway from Tall Pine Trail to Highway 98 Overpass Location …
Shoreline Park Completed in July Wayside Park install completed waiting on FPL power …
Project Completed June 2024 Considering possible modifcations Project Construction …
Schematic design completed Design documents at 90% Presented to City Council In July …
State and USACE Permits received as of 9-10-24 The project set to advertise for bids in …
Currently under construction Sheet Pile Wall Pier Boardwalk Project …
The Project Area is located in the City of Gulf Breeze in two different areas. The first …