Wetlands Trail Boardwalk Repairs
This repair work follows the identification of widespread defects in the decking material. Although the boardwalk was completed in 2022, the City identified cracking and splitting in the DuxxBak Composite Decking during the warranty period. While initial inspections in 2023 and 2024 showed isolated issues, follow-up inspections in early 2025 revealed that approximately 87% of the deck boards were affected.







